During construction works dewatering or groundwater control is done to temporarily lower groundwater levels. As a dewatering contractor, you want to have an overview of the operation of the pump, the total flow rate and the groundwater levels at any time.
The solution to this challenge must be affordable, also for small or medium-sized companies and on smaller construction yards.
From the Crodeon blog
During construction works dewatering or groundwater control is done to temporarily lower groundwater levels.
As a dewatering contractor, you want to have an overview of the operation of the pump, the total flow rate and the groundwater levels at any time.
For applications in remote areas you can power your Reporter with a small solar panel (dimensions: 35cm x 30cm). This way the Reporter has everything on board to charge during the day and easily survive multiple nights without sunlight, even when operating at a low measurement interval.
If you do have grid power available, then your Reporter will monitor this power supply and notify you in case of a power outage.
Reporter is compatible with a wide range of flow meters from many renowned manufacturers. We prefer flow meters with a pulse output, but other output signals can also be considered. Contact us to find out if your flow meter is compable.
The mounting and startup of a Reporter takes only a few minutes. You only need to sign in to the Crodeon Dashboard and connect the sensors. The Dashboard will allow you to activate your Reporter with one click in order to start measuring. There you also have the ability to configure settings such as the measurement interval and alarm thresholds.
No technical skills are required to start using our technology.
Sign up for a free account on the Crodeon Dashboard and a watch a real live working demo.
Schedule an appointment with Jonathan, our Sales Manager, for more information about this solution.
For partnerships, distribution, or any other question, don't hesistate to contact us!